Applying the 1st Coat of MicroDur Plus Base

Follow the directions below to apply the Microdur Plus Base.  The 1st coat of Microdur Plus Base can be applied without colour, to set a neutral foundation for subsequent coats.  You’ll be applying 2 coats of Microdur Plus Base, followed by the Microcement Top Coats.

The installation guide includes a video demonstration of how to apply the 1st coat of Microdur Plus Base efficiently and effectively, plus detailed written instructions.

See Technical Info for the key technical facts.

Mixing 1st Coat of MicroDur Plus Base without Colour

You will need 10kg of MicroDur Base to complete 1 coat over 10m2. Split your MicroDur Base into equal batches of 10kg.  Mix no more than 2 batches at a time.

For each 10kg batch, measure 2.4Kg Microdur Plus Comp A + 300g Microdur Plus Comp B using a measuring jug.

For each 20kg batch, measure 4.8Kg  Microdur Plus Comp A + Microdur Plus 600g Comp B.

Mix the A + B components into a mixing bucket, then slowly add the MicroDur Base, mixing as you go to avoid lumps forming in the mix. Be aware that you’ll have 2 hours of working time once mixed.

Mix thoroughly with a microcement mixer head attachment on a cordless drill. Let the mixture rest for a few minutes before applying.

In order to set a neutral foundation, it’s best to apply the 1st base coat without any colour toner.  If you ordered a kit, you will be supplied enough colour toner for the 2nd base coat only.

Applying 1st Coat MicroDur Plus Base

Using a Microcement Trowel, work your way out from one corner creating a random edge pattern. Keep trowel movements small and random, avoid long sweeping arches – as these will show through to your final finish.

Use the grain in the microcement as your level – if you apply the microcement thicker than the size of the grain, the finish won’t be as strong and will require a lot more sanding. Run the trowel back over each section that you have put down to smooth it out and remove excess product.

Completely cover each surface without stopping. For complete rooms, start with ceilings, then walls from left to right (or right to left) and then the floor.

Run your finger or a corner trowel along internal corners to push the microcement into the corner and then gently trowel away the excess product.

Large Floor Areas

For large floor areas, you may find it quicker to use a Squeegee Trowel to apply your 1st base coat.

Pour the Microcement along the width of the room and use the Squeegee to flatten it out over the floor so that it is no thicker than the grain in all areas.

Complete around a metre before wiping the excess off the trowel and going back over the area to remove any raised lines & remove any excess product, before moving onto the next section.

Sanding the 1st Base Coat

If your trowel technique is correct, the surface should be flat & even after the 1st base coat, so you shouldn’t need to sand it.

However, if there are ridges in the surface, or the coverage across the area isn’t even, then we do recommend that you sand the 1st base coat before moving on.

Wait until the surface is dry, this should take around 3 hours, but will depend on the conditions.

Use a 40-grit sanding disc to sand evenly across the area, removing any ridges, high spots & imperfections.

Ensure the surface is free from dust before applying the 2nd base coat directly onto the surface (no additional primer is needed).

Cemher Microdur Plus Base

 
Process 1 x Coat Microdur Base Plus (No Colour)
1 x Coat Microdur Base Plus (With Colour)
Mix Ratio 20kg Microdur Base : 4.8kg Microdur Plus Comp A : 600g Microdur Plus Comp B
8 : 1
Standard Consumption 20kg per 10m2 (2 Coats)
Estimated Drying Time Between Coats:
Minimum 3 hours
No Maximum

Before Sealers:
Minimum 24 hours
No Maximum
Tools Required Microcement Trowel
Microcement Mixer
Hawk & Bucket Trowel
Clean Mixing Bucket
Weighing Scales
Measuring Jug
PPE