Surface Prep
Before you prime and mesh it’s essential that your surface is completely flat, dry and well-consolidated, so that there is no chance of movement. Use a small amount of the base coat or a suitable filler to flush out joins and counter-sunk screw holes and sand until the surface is completely flat. See surface prep for full details of preparing surface for microcement.
Introduction to ImpriPox, Mesh & Sand Blind
ImpriPox is a 2 part epoxy primer that will bond the Fibreglass Mesh to your substrate, adding strength to the substrate and creating a strong, impenetrable base for your microcement.
It will also ensure a uniform drying rate across the microcement surface and block stains in the substrate transferring through to you microcement.
It is particularly good at stopping small cracks in concrete floors and joins between boards being transferred through from the substrate to the microcement. The chance of movement must still be eliminated in advance.
Tools you’ll Need
You will need a knife to cut the mesh, weighing scales, a mixing bucket and a Squeegee Trowel to apply the Primer plus PPE suitable for working with Epoxies.
Prepare the Mesh
Cut the mesh to size & then flip it over so that it curls towards the surface. If you are microcementing over both the walls and floor, you can use Self-Adhesive Fibreglass Mesh around the perimeter of the room to bridge the join between the wall and floor, followed by Fibreglass Mesh for Floors right into the corner. This will ensure you get a strong bond across both surfaces.
Mix the ImpriPox
Mix the ImpriPox with ImpriPox Hardener in a mixing bucket and stir gently with a paint stirrer or Microcement Mixer on a low speed for a few minutes.
The Mix Ratio is 5 x ImpriPox : 2 x ImpriPox Hardener
For every 10m2 you’ll need 2l ImpriPox : 800ml ImpriPox Hardener
This mixture will cover around 10m2 when trowelled over the mesh. If you use less than the full containers then weigh it carefully to ensure the ratio is accurate.
You will have a working time of around 1 hour once the ImpriPox has been mixed with the hardener.
Applying the ImpriPox
Use the Squeegee to apply an even coat of ImpriPox over the surface and mesh. You’ll need to ensure you have completely filled any voids in the sub-floor (e.g. grout lines, joins and screw holes) and also completely covered the mesh.
Applying Quartz Sand
Whilst the ImpriPox is still wet, spread the quartz sand across the surface. You can scatter it by hand, starting at the entrance to the room and walking on the sand into the room. Or by walking on the ImpriPox with spiked shoes.
Leave to Dry
Leave to dry. This should take around 12 hours depending on temperature and ventilation.
Sand & Vacuum Loose Sand
Once dry, run an orbital sander or floor sander over the surface to ensure it is completely flat. Then vacuum off the loose sand.
Apply Primer 100
In most cases, you’ll need to use Primer 100 on top of the ImpriPox and Sand before applying the microcement.
Use a medium pile roller to apply an even coat of primer to the surface. Leave the primer to dry. This should take around 1 hour.
No Primer 100 is required for MicroPool.
Cemher Primer 100
| Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds | All Other Surfaces including Non Absorbent Surfaces | |
|---|---|---|
| Process | Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds: Diluted Coat followed by Neat Coat | All Other Surfaces including Non Absorbent Surfaces: Apply Neat Coat Directly |
| Mix Ratio |
Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds:
Diluted Coat: 50% Water / 50% Primer 100 Neat Coat: Maximum 10% Water |
All Other Surfaces including Non Absorbent Surfaces: Maximum 10% Water |
| Standard Consumption | Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds: 1l per 4 - 6m2 | All Other Surfaces including Non Absorbent Surfaces: 1l per 8 - 10m2 |
| Estimated Drying Time |
Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds:
Diluted Coat: 30 minutes No Maximum Neat Coat: Minimum 30 minutes Maximum 8 hours |
All Other Surfaces including Non Absorbent Surfaces:
Minimum 30 minutes Maximum 12 hours |
| Tools Required |
Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds:
Medium Microfibre Roller Roller Tray PPE |
All Other Surfaces including Non Absorbent Surfaces:
Medium Microfibre Roller Roller Tray PPE |
Cemher ImpriPox
| Internal Floors & Worktops | |
|---|---|
| Process |
Internal Floors & Worktops:
Apply 1 Coat of Impripox over Fibreglass Mesh Whilst wet, scatter quartz sand over the surface until saturated |
| Mix Ratio |
Internal Floors & Worktops:
1l Impripox : 400ml Impripox Comp B 4l Impripox : 1.6l Impripox Comp B |
| Standard Consumption | Internal Floors & Worktops: 1l Impripox + 400ml Impripox Comp B per 5m2 |
| Estimated Drying Time |
Internal Floors & Worktops:
Minimum 12 hours Maxium 36 hours before applying subsiquent coats |
| Tools Required |
Internal Floors & Worktops:
Mechanical Mixer Clean Mixing Bucket Squeegee Trowel PPE |