Mixing MaxiPur
Mix the MaxiPur Comp A with the MaxiPur Comp B in a mixing jug and stir gently with a paint stirrer for at least a minute. Do not whisk as it will put too much air in the mix. Leave to rest for a couple of minutes before applying.
For each coat, you will need 400ml MaxiPur Comp A + 200ml MaxiPur Comp B per 10m2.
The mixing ratio is 2 x MaxiPur Comp A : 1 x MaxiPur Comp B.
Only mix enough for 1 coat at a time, as the mixture will only last for 45 minutes once combined.
IMPORTANT: Eye Protection, Gloves, Filtering Masks, suitable for use with Solvents must be worn when working with MaxiPur
Applying the MaxiPur
Use a medium pile roller to apply the MaxiPur evenly across the entire area.
Starting in one corner, apply the MaxiPur in an area and then go back over it very gently with the roller to remove any excess product, air bubbles and lines.
Work quickly & randomly keeping the edge wet.
Ensure you cover the full area with MaxiPur and use the full amount provided.
Swimming Pools & Outdoor Surfaces
Only apply 1 coat of MaxiPur on Swimming Pools and Outdoor Surfaces, this will allow the Microcement to remain semi-permiable and prevent moisture from building up on the underside.
Leave to Dry
Leave the 1st coat to dry for a minimum of 12 hours before applying the 2nd coat.
Leave to Dry
Leave for at least 48 hours. Light use only for the first 14 days.
IMPORTANT: Like all cementitious products, microcement takes 28 days to full harden. It’s at it’s softest for the first 14 days after laying. During this time it should only be subjected to light use and light foot traffic.
Any heavy work is not recommended, but if it does take place then we recommend that you cover the floor with a breathable material or only cover down whilst working & lift the protection off for the majority of the time. The surface needs to dry out and harden. If airflow is restricted, it will stain & not cure correctly.
Cemher MaxiPur 50
Internal Surfaces | Swimming Pools & External Surfaces | |
---|---|---|
Process | Internal Surfaces: Apply 2 Coats of MaxiPur 50% | Swimming Pools & External Surfaces: Apply 1 Coat of MaxiPur 50% |
Mix Ratio |
Internal Surfaces:
2 MaxiPur Comp A : 1 MaxiPur Comp B 1l MaxiPur Comp A : 500ml MaxiPur Comp B |
Swimming Pools & External Surfaces:
2 MaxiPur Comp A : 1 MaxiPur Comp B 1l MaxiPur Comp A : 500ml MaxiPur Comp B |
Standard Consumption | Internal Surfaces: 1l per 8 - 10m2 | Swimming Pools & External Surfaces: 1l per 8 - 10m2 |
Estimated Drying Time |
Internal Surfaces:
Minimum 12 hours between coats 48 hours before light foot traffic |
Swimming Pools & External Surfaces: 48 hours before light foot traffic |
Tools Required |
Internal Surfaces:
Roller Suitable for Use with Solvents Roller Tray Protective goggles Rubber gloves Filtered mask for organic solvents |
Swimming Pools & External Surfaces:
Roller Suitable for Use with Solvents Roller Tray Protective goggles Rubber gloves Filtered mask for organic solvents |