-
Introduction
Introduction
This guide contains everything you need to know about the application of the microcement products in your kit. The short video will help you to understand how Io navigate the training, as will the written introduction.
Introduction to Your Training
-
Step 1
Primers + Mesh
Which Products?
The following products are needed for this step. You might find it helpful to gather them together so you can see what you’re working with.
Cemher ImpriPox
Quartz Sand
Cemher Primer 100
Surface Prep
Before you prime and mesh it’s essential that your surface is completely flat, dry and well-consolidated, so that movement has been eliminated. For more information on preparing surfaces for microcement, please see the surface prep section of our website.
Introduction to ImpriPox, Mesh & Quartz Sand
ImpriPox is a 2-part epoxy primer that will bond the Fibreglass Mesh to your substrate, adding strength and creating a strong, solid base for your microcement.
The Impripox will ensure a uniform drying rate across the microcement surface and block stains in the substrate transferring through to you microcement.
It is particularly good at stopping small cracks in concrete floors and joins between boards being transferred through from the substrate to the microcement. The chance of movement must still be eliminated in advance.
Tools you’ll Need
You’ll need the following tools in order to successfully apply the microcement:
- Knife to cut the mesh
- Weighing scales or measuring jug
- Mixing bucket
- Squeegee Trowel
- PPE suitable for working with epoxy
Prepare the Mesh
Cut the mesh to size & then flip it over so that it curls towards the surface. If you are microcementing over both the walls and floor, you can use Self-Adhesive Fibreglass Mesh around the perimeter of the room to bridge the join between the wall and floor, followed by Fibreglass Mesh for Floors right into the corner. This will ensure you get a strong bond across both surfaces.
Mix the ImpriPox
Mix the ImpriPox with ImpriPox Hardener in a mixing bucket and stir gently with a paint stirrer or Microcement Mixer on a low speed for a few minutes.
The Mix Ratio is 5 x ImpriPox : 2 x ImpriPox Hardener
For every 10m2 you’ll need around 2l ImpriPox : 800ml ImpriPox Hardener. If there are a lot of voids in the surface that need filling with the Impripox, you may need more.
This mixture will cover around 10m2 when trowelled over the mesh. If you have less than 10m2, weigh or measure the volume of each product to ensure the ratio is accurate. If the ratio is wrong, the products may not set.
You will have a working time of around 1 hour once the ImpriPox has been mixed with the hardener.
Applying the ImpriPox
Use the Squeegee Trowel to apply an even coat of ImpriPox over the surface and mesh. You’ll need to ensure you have completely filled any voids in the sub-floor (e.g. grout lines, joins and screw holes) and also completely covered the mesh.
Applying Quartz Sand
Whilst the ImpriPox is still wet, spread the quartz sand across the surface. You can scatter it by hand, starting at the entrance to the room and walking on the sand into the room. Or by walking on the ImpriPox with spiked shoes.
Leave to Dry
Leave to dry. This should take around 12 hours depending on temperature and ventilation.
Sand & Vacuum Loose Sand
Once dry, run an orbital sander or floor sander over the surface to ensure it is completely flat. Then vacuum off the loose sand.
Apply Primer 100
In most cases, you’ll need to use Primer 100 on top of the ImpriPox and Sand before applying the microcement.
Use a medium pile roller to apply an even coat of primer to the surface. Leave the primer to dry. This should take around 1 hour.
No Primer 100 is required for MicroPool.
Cemher ImpriPox
Internal Floors & Worktops Process Internal Floors & Worktops: 1 x Coat of Impripox over Fibreglass Mesh
Scatter Quartz Sand, whilst wet, over the surface until saturatedMix Ratio Internal Floors & Worktops: 1l Impripox : 400ml Impripox Comp B
4l Impripox : 1.6l Impripox Comp BStandard Consumption Internal Floors & Worktops: 1l + 400ml per 5m2 Estimated Drying Time Internal Floors & Worktops: Minimum 12 hours
Maximum 36 hours without sand
No maximum with sandTools Required Internal Floors & Worktops: Mechanical Mixer
Clean Mixing Bucket
Squeegee TrowelSafety & PPE Internal Floors & Worktops: Nitrile gloves — essential, dispose of after use
Eye protection — essential
Ensure adequate ventilation throughout
Keep away from heat and ignition sources
Avoid skin contact - may cause skin sensitisationCemher Primer 100
Highly Absorbent Surfaces All Other Surfaces Process Highly Absorbent Surfaces: 1 x Diluted Coat
1 x Neat CoatAll Other Surfaces: 1 x Neat Coat Mix Ratio Highly Absorbent Surfaces: Diluted Coat:
50% Water / 50% Primer 100
Neat Coat:
Maximum 10% WaterAll Other Surfaces: Maximum 10% Water Standard Consumption Highly Absorbent Surfaces: 1l per 4 - 6m2 All Other Surfaces: 1l per 8 - 10m2 Estimated Drying Time Highly Absorbent Surfaces: Diluted Coat:
30 minutes
No Maximum
Neat Coat:
Minimum 30 minutes
Maximum 12 hoursAll Other Surfaces: Minimum 30 minutes
Maximum 12 hoursTools Required Highly Absorbent Surfaces: Medium Microfibre Roller
Roller TrayAll Other Surfaces: Medium Microfibre Roller
Roller TraySafety & PPE Highly Absorbent Surfaces: Nitrile gloves
Eye protection
Ensure adequate ventilation throughoutAll Other Surfaces: Nitrile gloves
Eye protection
Ensure adequate ventilation throughoutCemher ImpriPox
Cemher Primer 100
-
Step 2
Base Coats
Which Products?
The following products are needed for this step. You might find it helpful to gather them together so you can see what you’re working with.
Cemher MicroPool
Apply without Primer & Mesh
Unlike many of the microcements, Micropool should be applied directly to the surface without primer and mesh.
For boarded surfaces, where there are joins, use Impripox Primer over mesh, without sand, once cured, the Micropool can be applied directly to the surface.
Mixing the Micropool with Comp B
Micropool is pre-mixed with the colour in the tub. Start by giving the tub a good mix to make sure the colour is evenly distributed.
Then add the Micropool Comp B into the Micropool at a ratio of 10kg Micropool : 500ml Micropool Comp B.
Once mixed, you will have around 45 minutes – 1 hour to work with it, depending on the conditions, so you may want to mix it in smaller batches until you get a feel for it.
The standard consumption for Micropool is 12kg for each coat over 10m2. And you’ll be applying 3 coats in total.
Applying the 1st Coat of Micropool
Using a Microcement Trowel, work your way out from one corner creating a random edge pattern. Keep trowel movements small and random, avoid long sweeping arches – as these will show through to your final finish.
Use the grain in the microcement as your level – if you apply the microcement thicker than the size of the grain, the finish won’t be as strong and will require a lot more sanding. Run the trowel back over each section that you have put down to smooth it out and remove excess product.
Completely cover each surface without stopping. For complete rooms, start with ceilings, then walls from left to right (or right to left) and then the floor.
Run your finger or a corner trowel along internal corners to push the microcement into the corner and then gently trowel away the excess product.
Large Floor Areas
For large floor areas, you may find it quicker to use a Squeegee Trowel to apply your 1st base coat.
Pour the Microcement along the width of the room and use the Squeegee to flatten it out over the floor so that it is no thicker than the grain in all areas.
Complete around a metre before wiping the excess off the trowel and going back over the area to remove any raised lines & remove any excess product, before moving onto the next section.
Leave to Dry
Drying time will vary depending on temperature and ventilation. We would expect it to be dry enough to take another of Micropool within 3 hours.
Sand with 40/80 Grit Sand Paper
Use a strong sand paper, like Silicone Carbide, to prevent colour from the disc transferring to your work.
Flatten the Micropool with a 40 or 80 grit sandpaper. An orbital sander is ideal. Or for large floor areas, you may prefer to use a floor sander.
Use the sandpaper to remove ridges and drips that have dried in the microcement.
Vacuum the surface to remove all dust and debris. Do not wet the microcement.
We stock a range of Microcement Sanding Discs on our website.
Mixing the Micropool with Comp B
Micropool is pre-mixed with the colour in the tub. Start by giving the tub a good mix to make sure the colour is evenly distributed.
Then add the Micropool Comp B into the Micropool at a ratio of 10kg Micropool : 500ml Micropool Comp B.
Once mixed, you will have around 45 minutes – 1 hour to work with it, depending on the conditions, so you may want to mix it in smaller batches until you get a feel for it.
The standard consumption for Micropool is 12kg for each coat over 10m2. And you’ll be applying 3 coats in total.
Applying the 2nd Coat of Micropool
Apply the 2nd coat in exactly the same way that you applied the 1st.
Using a Microcement Trowel, work your way out from one corner creating a random edge pattern. Keep trowel movements small and random, avoid long sweeping arches – as these will show through to your final finish.
Use the grain in the microcement as your level – if you apply the microcement thicker than the size of the grain, the finish won’t be as strong and will require a lot more sanding. Run the trowel back over each section that you have put down to smooth it out and remove excess product.
Completely cover each surface without stopping. For complete rooms, start with ceilings, then walls from left to right (or right to left) and then the floor.
Run your finger or a corner trowel along internal corners to push the microcement into the corner and then gently trowel away the excess product.
Large Floor Areas
For large floor areas, you may find it quicker to use a Squeegee Trowel to apply your 1st base coat.
Pour the Microcement along the width of the room and use the Squeegee to flatten it out over the floor so that it is no thicker than the grain in all areas.
Complete around a metre before wiping the excess off the trowel and going back over the area to remove any raised lines & remove any excess product, before moving onto the next section.
Leave to Dry
Drying time will vary depending on temperature and ventilation. We would expect it to be dry enough to take another of Micropool within 3 hours.
Sand with 40/80 Grit Sand Paper
Use a strong sand paper, like Silicone Carbide, to prevent colour from the disc transferring to your work.
Flatten the Micropool with a 40 or 80 grit sandpaper. An orbital sander is ideal. Or for large floor areas, you may prefer to use a floor sander.
Use the sandpaper to remove ridges and drips that have dried in the microcement.
Vacuum the surface to remove all dust and debris. Do not wet the microcement.
We stock a range of Microcement Sanding Discs on our website.
Cemher MicroPool
Process 3 x Micropool (With Colour) Mix Ratio 10kg Micropool : 500ml Micropool Comp B
20 : 1Standard Consumption 36kg per 10m2 (3 Coats) Estimated Drying Time Between Coats:
Minimum 30 minutes
No Maximum
Before Sealers:
Minimum 24 hours
No MaximumTools Required Microcement Trowel
Microcement Mixer
Clean Mixing Bucket
Weighing Scales
Measuring Jug
PPE -
Step 3
Top Coats
Which Products?
The following products are needed for this step. You might find it helpful to gather them together so you can see what you’re working with.
Cemher MicroPool
Mixing the Micropool with Comp B
This is pre-mixed with the colour in the tub, so all you need to do is give it a mix before you start to loosen it and make sure the colour is evenly distributed.
Mix the Comp B into the Micropool at a ratio of 10kg Micropool : 500ml Micropool Comp B.
Once mixed, you will have around 45 minutes to work with it, depending on the conditions, so you may want to mix it in smaller batches until you get a feel for it.
You will need 10kg-12kg per 10m2 for 1 coat of Micropool.
Applying the 1st Coat of Micropool
Using a Microcement Trowel, work your way out from one corner creating a random edge pattern. Keep trowel movements small and random, avoid long sweeping arches – as these will show through to your final finish.
Mixing the 3rd Coat of Micropool
Mix in exactly the same way that you mixed the previous coats, here’s a reminder of the process:
Give the tub a good mix before you start to loosen it and make sure the colour is evenly distributed.
Mix the Comp B into the Micropool at a ratio of 10kg Micropool : 500ml Micropool Comp B.
Once mixed, you will have around 45 minutes to work with it, depending on the conditions, so you may want to mix it in smaller batches until you get a feel for it.
You will need 10kg-12kg per 10m2 for 1 coat of Micropool.
Apply the Micropool
Again, these coat needs to be applied thinly. Use exactly the same technique as you did with the previous coats of Micropool.
Leave to Dry
Once you have applied all 3 coats. You can leave it to dry out fully, this should take around 24 hours, but does vary depending on heating, ventilation & the specific site conditions.
Sand with 40/80 Grit Sand Paper
Use a strong sand paper, like Silicone Carbide, to prevent colour from the disc transferring to your work.
Flatten the Micropool with a 40 or 80 grit sandpaper. An orbital sander is ideal. Or for large floor areas, you may prefer to use a floor sander.
Use the sandpaper to remove ridges and drips that have dried in the microcement.
Vacuum the surface to remove all dust and debris. Do not wet the microcement.
We stock a range of Microcement Sanding Discs on our website.
Cemher MicroPool
Process 3 x Micropool (With Colour) Mix Ratio 10kg Micropool : 500ml Micropool Comp B
20 : 1Standard Consumption 36kg per 10m2 (3 Coats) Estimated Drying Time Between Coats:
Minimum 30 minutes
No Maximum
Before Sealers:
Minimum 24 hours
No MaximumTools Required Microcement Trowel
Microcement Mixer
Clean Mixing Bucket
Weighing Scales
Measuring Jug
PPE -
Step 4
Sealers
Which Products?
The following products are needed for this step. You might find it helpful to gather them together so you can see what you’re working with.
Cemher AquaMax Pro for Floors
Cemher MaxiPur
Using Aquamax Pro for Floors on Walls
You can use Aquamax Pro for Floors on Walls, in fact, we often include it in bathroom kits and worktop kits, because it is a stronger more durable product.
Mixing 1st Coat AquaMax Pro Floors
Mix the Aquamax Pro Comp A with the Aquamax Pro Floors Comp B in a mixing jug and stir gently with a paint stirrer for at least a minute. Do not whisk as it will put too much air in the mix. Leave to rest for a couple of minutes before applying.
For each coat, you will need 500ml AquaMax Pro Comp A + 100ml AquaMax Pro Floors Comp B per 10m2.
The mixing ratio is 1l x AquaMax Pro Comp A : 200ml x AquaMax Pro Floors Comp B.
Only mix enough for 1 coat at a time, as the mixture will only last for 45 minutes once combined.
Applying the 1st Coat AquaMax Pro Floors
Use a medium pile roller to apply the Aquamax Pro evenly across the entire area.
Starting in one corner, apply the Aquamax Pro in an area and then go back over it very gently with the roller to remove any excess product, air bubbles and lines.
Work quickly & randomly keeping the edge wet.
Use a small roller to squash Aquamax into internal corners and open edges. Then gently roll the excess away. Take care to get good coverage on shower wastes and other open edges.
Ensure you cover the full area with AquaMax Pro and use the full amount provided (500ml+50ml per 10m2 for each coat).
Leave to Dry
Leave the 1st coat to dry for a minimum of 12 hours before applying the 2nd coat.
Applying the 2nd Coat AquaMax Pro Floors
After 12 hours, you can complete the 2nd coat of AquaMax Pro. Check the surface for bits of dust and debris that may have settled in it. You can use a 400 grit sanding disc or razor scraper to remove these before applying your final coat.
Mix and apply the 2nd coat in exactly the same way that you did the 1st one.
Again, you will need 500ml AquaMax Pro Comp A & 100ml AquaMax Pro Floors Comp B to complete 1 coat over 10m2.
Leave to Dry
Leave for at least 48 hours. Light use only for the first 14 days.
Silicone Open Edges
Once the 2nd coat is dry, take off the tape around shower wastes and open edges, and run a bead of silicone along the join to prevent any water getting behind the microcement.
IMPORTANT: Like all cementitious products, microcement takes 28 days to full harden. It’s at it’s softest for the first 14 days after laying. During this time it should only be subjected to light use and light foot traffic.
Any heavy work is not recommended, but if it does take place then we recommend that you cover the floor with a breathable material or only cover down whilst working & lift the protection off for the majority of the time. The surface needs to dry out and harden. If airflow is restricted, it will stain & not cure correctly.
Introduction to Maxipur
Maxipur is a very effective and quick drying sealer, but because it is a solvent based product, its important that our guidance is followed in full. The following points are essential for a safe, successful installation:
- Eye Protection, Filtering Masks, suitable for use with Solvents must be worn when working with MaxiPur & good ventilation maintained until cured. Failure to do so may result in sickness, see materials safety datasheets for more information.
- Only apply with rollers that are suitable for use with solvents & clean roller trays and cages. Failure to do so will result in discolouration on the surface.
Mixing MaxiPur
Mix the MaxiPur Comp A with the MaxiPur Comp B in a mixing jug and stir gently with a paint stirrer for at least a minute. Do not whisk as it will put too much air in the mix. Leave to rest for a couple of minutes before applying.
For each coat, you will need 500ml MaxiPur Comp A + 250ml MaxiPur Comp B per 10m2.
The mixing ratio is 2 x MaxiPur Comp A : 1 x MaxiPur Comp B.
Only mix enough for 1 coat at a time, as the mixture will only last for 45 minutes once combined.
IMPORTANT: Eye Protection, Gloves, Filtering Masks, suitable for use with Solvents must be worn when working with MaxiPur
Applying the 1st Coat MaxiPur
Use a medium pile roller that is suitable for solvents to apply the MaxiPur evenly across the entire area.
Starting in one corner, apply the MaxiPur in an area and then go back over it very gently with the roller to remove any excess product, air bubbles and lines.
Work quickly & randomly keeping the edge wet.
Ensure you cover the full area with MaxiPur and use the full amount provided.
Use a small roller to squash Aquamax into internal corners and open edges. Then gently roll the excess away. Take care to get good coverage on shower wastes and other open edges.
Swimming Pools & Outdoor Surfaces
Only apply 1 coat of MaxiPur on Swimming Pools and Outdoor Surfaces, this will allow the Microcement to remain semi-permeable and prevent moisture from building up on the underside.
Leave to Dry
Leave the 1st coat to dry for a minimum of 12 hours before applying the 2nd coat.
Applying the 2nd Coat MaxiPur
After 12 hours, you can complete the 2nd coat of MaxiPur. Check the surface for bits of dust and debris that may have settled in it. You can use a 400 grit sanding disc or razor scraper to remove these before applying your final coat.
Mix and apply the 2nd coat in exactly the same way that you did the 1st one.
Again, you will need 500ml MaxiPur Comp A & 250ml MaxiPur Comp B to complete 1 coat over 10m2.
Silicone Open Edges
Once the 2nd coat is dry, take off the tape around shower wastes and open edges, and run a bead of silicone along the join to prevent any water getting behind the microcement.
Leave to Dry
Leave for at least 48 hours. Light use only for the first 14 days.
IMPORTANT: Like all cementitious products, microcement takes 28 days to full harden. It’s at it’s softest for the first 14 days after laying. During this time it should only be subjected to light use and light foot traffic.
Any heavy work is not recommended, but if it does take place then we recommend that you cover the floor with a breathable material or only cover down whilst working & lift the protection off for the majority of the time. The surface needs to dry out and harden. If airflow is restricted, it will stain & not cure correctly.
Cemher AquaMax Pro for Floors
Application on Microne, Microdur Plus & Hydroprimer Application on Polyshield & Micropool Process Application on Microne, Microdur Plus & Hydroprimer: 2 x Coats AquaMax Pro for Floors Application on Polyshield & Micropool: 1 x Coat of AquaMax Pro for Floors Mix Ratio Application on Microne, Microdur Plus & Hydroprimer: 5 AquaMax Pro Comp A : 1 AquaMax Pro Comp B
1l AquaMax Pro Comp A : 200ml AquaMax Pro Comp BApplication on Polyshield & Micropool: 5 AquaMax Pro Comp A : 1 AquaMax Pro Comp B
1l AquaMax Pro Comp A : 200ml AquaMax Pro Comp BStandard Consumption Application on Microne, Microdur Plus & Hydroprimer: 1l per 10m2 Application on Polyshield & Micropool: 500ml per 10m2 Estimated Drying Time Application on Microne, Microdur Plus & Hydroprimer: Minimum 12 hours between coats
48 hours before light foot trafficApplication on Polyshield & Micropool: Minimum 12 hours between coats
48 hours before light foot trafficTools Required Application on Microne, Microdur Plus & Hydroprimer: Medium Microfibre Roller
Roller TrayApplication on Polyshield & Micropool: Medium Microfibre Roller
Roller TraySafety & PPE Application on Microne, Microdur Plus & Hydroprimer: Nitrile gloves
Eye protection
Ensure adequate ventilation throughoutApplication on Polyshield & Micropool: Nitrile gloves
Eye protection
Ensure adequate ventilation throughoutCemher MaxiPur
Internal Surfaces Swimming Pools & External Surfaces Process Internal Surfaces: 2 x Coats of MaxiPur Swimming Pools & External Surfaces: 1 x Coat of MaxiPur Mix Ratio Internal Surfaces: 2 MaxiPur Comp A : 1 MaxiPur Comp B
1l MaxiPur Comp A : 500ml MaxiPur Comp BSwimming Pools & External Surfaces: 1 MaxiPur Comp A : 2 MaxiPur Comp B
1l MaxiPur Comp A : 1l MaxiPur Comp BStandard Consumption Internal Surfaces: 1l per 8 - 10m2 Swimming Pools & External Surfaces: 1l per 8 - 10m2 Estimated Drying Time Internal Surfaces: Minimum 4 hours between coats
48 hours before light foot trafficSwimming Pools & External Surfaces: 48 hours before light foot traffic Tools Required Internal Surfaces: Roller Suitable for Use with Solvents
Roller TraySwimming Pools & External Surfaces: Roller Suitable for Use with Solvents
Roller TraySafety & PPE Internal Surfaces: Rubber gloves
Protective goggles
Filtered mask suitable for organic solvents
Ensure adequate ventilation - essential
Flammable above 370°CSwimming Pools & External Surfaces: Rubber gloves
Protective goggles
Filtered mask suitable for organic solvents
Ensure adequate ventilation - essential
Flammable above 370°CCemher AquaMax Pro for Floors
Cemher MaxiPur
-
After Care
Special Care for the First 28 Days
Microcement & Microcement Sealers harden over time. They’re most delicate for the 1st few days and weeks. They slowly strengthen as time goes on, until they reach close to full strength at around 28 days.
The stated curing times may vary depending on conditions. These table below shows how to care for new microcement surfaces over the first 28 days, with approximate timings:
0-12 Hours After Final Seal
- The final coat of sealer is still tacky
- Do not touch under any circumstances
- Close doors to avoid dust or fluff settling into the wet sealer
3 – 14 Days After Final Seal, Advice for Home Owners
- You can gently start to use the microcement surfaces
- Walk on floors in socks or barefoot
- You can use showers & sinks
- Don’t leave anything resting on the surfaces
- No heavy or wet items left on surfaces
- No shampoo bottles left in wet areas
- Avoid spills
- Clean up spills quickly to avoid stains
3 – 14 Days After Final Seal, Advice for Microcement Installers
- You can carefully start to install fittings
- Protect surfaces whilst working, but do not restrict airflow
- Use breathable surface protectors when working
- No covering down materials left on surface overnight
- Don’t leave anything resting on the surfaces
- Don’t leave anything resting on the surfaces
- No heavy or wet items left on surfaces
- Avoid spills
- Clean up spills quickly to avoid stains
14 – 28 Days After Final Seal
- You can now use the microcement surfaces more normally
- You can move furniture into the space
- Always lift and place heavy items rather than dragging them across the surface
General Care for Microcement Surfaces
Now that you’re over the first month, you can relax and enjoy your new microcement surface. Microcement is strong, durable and waterproof, so you can treat it like you would treat any other surface finish.
Here our guidelines for keeping your microcement surface in excellent condition for years to come:
Cleaning
- Regular cleaning with pH neutral cleaning products
- Steam cleaners can be used on all floors excluding Microdur surfaces
- Bleach & mould cleaner can be used for occasional deep cleans but always neutralise once cleaning is complete
- Do not regularly clean microcement surfaces with aggressive or descaling products
Maintenance
- Use Cemher Floor Protect every 2 -3 months to protect you microcement and to help build up the sealers
- Reseal surfaces only if they begin to look tired, or if water leaves a mark on the surface
Heavy Items
- No dragging heavy objects across the surface
- No dropping heavy objects onto the surface
- Lift furniture rather than dragging it
- Use lids or felt pads to protect flooring from pressure points or abrasive surfaces
Avoid Stains
- Do not leave spills on the surface for prolonged time periods
- Do not leave products containing dyes, turmeric or rubber on the surface for more than 15 minutes
- Acidic & alkaline products can start to wear down the sealers if left for prolonged time periods
- If water stains appear at any time, let the stain dry out & reseal immediately
- Stains may become permanent if not treated quickly
Avoid Prolonged Water Exposure
- Do not leave wet items including; towels, plant pots, wet shampoo bottles etc. in direct, prolonged contact with microcement surfaces
Fail to Prepare, Prepare to Fail
Surface prep is the most important part of any job. And because microcement is only 3-4mm finished, it’s more important than ever. But don’t worry, we’ve got you covered. Check out our Surface Prep for detailed guidance on preparing a wide range of surfaces for the microcement application.
Surface Prep
Need Help with your Kit?
Installation issues can happen, but we’re here to help. Our comprehensive troubleshooting guides cover common challenges and proven solutions for microcement application.
View Troubleshooting Guides