-
Primers + Mesh
Surface Prep
Before you prime and mesh it’s essential that your surface is completely flat, dry and well-consolidated, so that there is no chance of movement. Use a small amount of the base coat or a suitable filler to flush out joins and counter-sunk screw holes and sand until the surface is completely flat. See surface prep for full details of preparing surface for microcement.
Introduction to ImpriPox, Mesh & Sand Blind
ImpriPox is a 2 part epoxy primer that will bond the Fibreglass Mesh to your substrate, adding strength to the substrate and creating a strong, impenetrable base for your microcement.
It will also ensure a uniform drying rate across the microcement surface and block stains in the substrate transferring through to you microcement.
It is particularly good at stopping small cracks in concrete floors and joins between boards being transferred through from the substrate to the microcement. The chance of movement must still be eliminated in advance.
Tools you’ll Need
You will need a knife to cut the mesh, weighing scales, a mixing bucket and a Squeegee Trowel to apply the Primer plus PPE suitable for working with Epoxies.
Prepare the Mesh
Cut the mesh to size & then flip it over so that it curls towards the surface. If you are microcementing over both the walls and floor, you can use Self-Adhesive Fibreglass Mesh around the perimeter of the room to bridge the join between the wall and floor, followed by Fibreglass Mesh for Floors right into the corner. This will ensure you get a strong bond across both surfaces.
Mix the ImpriPox
Mix the ImpriPox with ImpriPox Hardener in a mixing bucket and stir gently with a paint stirrer or Microcement Mixer on a low speed for a few minutes.
The Mix Ratio is 5 x ImpriPox : 2 x ImpriPox Hardener
For every 10m2 you’ll need 2l ImpriPox : 800ml ImpriPox Hardener
This mixture will cover around 10m2 when trowelled over the mesh. If you use less than the full containers then weigh it carefully to ensure the ratio is accurate.
You will have a working time of around 1 hour once the ImpriPox has been mixed with the hardener.
Applying the ImpriPox
Use the Squeegee to apply an even coat of ImpriPox over the surface and mesh. You’ll need to ensure you have completely filled any voids in the sub-floor (e.g. grout lines, joins and screw holes) and also completely covered the mesh.
Applying Quartz Sand
Whilst the ImpriPox is still wet, spread the quartz sand across the surface. You can scatter it by hand, starting at the entrance to the room and walking on the sand into the room. Or by walking on the ImpriPox with spiked shoes.
Leave to Dry
Leave to dry. This should take around 12 hours depending on temperature and ventilation.
Sand & Vacuum Loose Sand
Once dry, run an orbital sander or floor sander over the surface to ensure it is completely flat. Then vacuum off the loose sand.
Apply Primer 100
In most cases, you’ll need to use Primer 100 on top of the ImpriPox and Sand before applying the microcement.
Use a medium pile roller to apply an even coat of primer to the surface. Leave the primer to dry. This should take around 1 hour.
No Primer 100 is required for MicroPool.
Cemher ImpriPox
Internal Floors & Worktops Process Internal Floors & Worktops: Apply 1 Coat of Impripox over Fibreglass Mesh
Whilst wet, scatter quartz sand over the surface until saturatedMix Ratio Internal Floors & Worktops: 1l Impripox : 400ml Impripox Comp B
4l Impripox : 1.6l Impripox Comp BStandard Consumption Internal Floors & Worktops: 1l Impripox + 400ml Impripox Comp B per 5m2 Estimated Drying Time Internal Floors & Worktops: Minimum 12 hours
Maxium 36 hours before applying subsiquent coatsTools Required Internal Floors & Worktops: Mechanical Mixer
Clean Mixing Bucket
Squeegee Trowel
PPECemher Primer 100
Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds All Other Surfaces including Non Absorbent Surfaces Process Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds: Diluted Coat followed by Neat Coat All Other Surfaces including Non Absorbent Surfaces: Apply Neat Coat Directly Mix Ratio Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds: Diluted Coat:
50% Water / 50% Primer 100
Neat Coat:
Maximum 10% WaterAll Other Surfaces including Non Absorbent Surfaces: Maximum 10% Water Standard Consumption Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds: 1l per 4 - 6m2 All Other Surfaces including Non Absorbent Surfaces: 1l per 8 - 10m2 Estimated Drying Time Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds: Diluted Coat:
30 minutes
No Maximum
Neat Coat:
Minimum 30 minutes
Maximum 8 hoursAll Other Surfaces including Non Absorbent Surfaces: Minimum 30 minutes
Maximum 12 hoursTools Required Highly Absorbent Surfaces e.g. Fresh Plaster / Screeds: Medium Microfibre Roller
Roller Tray
PPEAll Other Surfaces including Non Absorbent Surfaces: Medium Microfibre Roller
Roller Tray
PPE -
Base Coats
Mixing the Micropool with Comp B
This is pre-mixed with the colour in the tub, so all you need to do is give it a mix before you start to loosen it and make sure the colour is evenly distributed.
Mix the Comp B into the Micropool at a ratio of 10kg Micropool : 500ml Micropool Comp B.
Once mixed, you will have around 45 minutes to work with it, depending on the conditions, so you may want to mix it in smaller batches until you get a feel for it.
You will need 10kg-12kg per 10m2 for 1 coat of Micropool.
Applying the 1st Coat of Micropool
Using a Microcement Trowel, work your way out from one corner creating a random edge pattern. Keep trowel movements small and random, avoid long sweeping arches – as these will show through to your final finish.
Use the grain in the microcement as your level – if you apply the microcement thicker than the size of the grain, the finish won’t be as strong and will require a lot more sanding. Run the trowel back over each section that you have put down to smooth it out and remove excess product.
Completely cover each surface without stopping. For complete rooms, start with ceilings, then walls from left to right (or right to left) and then the floor.
Run your finger or a corner trowel along internal corners to push the microcement into the corner and then gently trowel away the excess product.
Large Floor Areas
For large floor areas, you may find it quicker to use a Squeegee Trowel to apply your 1st base coat.
Pour the Microcement along the width of the room and use the Squeegee to flatten it out over the floor so that it is no thicker than the grain in all areas.
Complete around a metre before wiping the excess off the trowel and going back over the area to remove any raised lines & remove any excess product, before moving onto the next section.
Leave to Dry
Drying time will vary depending on temperature and ventilation. We would expect it to be dry enough to take another of Micropool within 3 hours.
Sand with 40/80 Grit Sand Paper
Use a strong sand paper, like Silicone Carbide, to prevent colour from the disc transferring to your work.
Flatten the Micropool with a 40 or 80 grit sandpaper. An orbital sander is ideal. Or for large floor areas, you may prefer to use a floor sander.
Use the sandpaper to remove ridges and drips that have dried in the microcement.
Vacuum the surface to remove all dust and debris. Do not wet the microcement.
We stock a range of Microcement Sanding Discs on our website.
Mixing the Micropool with Comp B
This is pre-mixed with the colour in the tub, so all you need to do is give it a mix before you start to loosen it and make sure the colour is evenly distributed.
Mix the Comp B into the Micropool at a ratio of 10kg Micropool : 500ml Micropool Comp B.
Once mixed, you will have around 45 minutes to work with it, depending on the conditions, so you may want to mix it in smaller batches until you get a feel for it.
You will need 10kg-12kg per 10m2 for 1 coat of Micropool.
Mixing the 2nd Coat of Micropool
Mix in exactly the same way that you mixed the 1st coat, here’s a reminder of the process:
Give the tub a good mix before you start to loosen it and make sure the colour is evenly distributed.
Mix the Comp B into the Micropool at a ratio of 10kg Micropool : 500ml Micropool Comp B.
Once mixed, you will have around 45 minutes to work with it, depending on the conditions, so you may want to mix it in smaller batches until you get a feel for it.
You will need 10kg-12kg per 10m2 for 1 coat of Micropool.
Applying the 2nd Coat of Micropool
Again, this coat needs to be applied thinly. Use exactly the same technique as you did with the 1st coat of Micropool.
Leave to Dry
Once you have applied all 3 coats. You can leave it to dry out fully, this should take around 24 hours, but does vary depending on heating, ventilation & the specific site conditions.
Sand with 40/80 Grit Sand Paper
Use a strong sand paper, like Silicone Carbide, to prevent colour from the disc transferring to your work.
Flatten the Micropool with a 40 or 80 grit sandpaper. An orbital sander is ideal. Or for large floor areas, you may prefer to use a floor sander.
Use the sandpaper to remove ridges and drips that have dried in the microcement.
Vacuum the surface to remove all dust and debris. Do not wet the microcement.
We stock a range of Microcement Sanding Discs on our website.
Cemher MicroPool
Process Apply 3 Coats Micropool Mix Ratio 10kg Micropool : 500ml Micropool Comp B Standard Consumption 40kg per 10m2 Estimated Drying Time Between Coats:
Minimum 30 minutes
No Maximum
Before Sealers:
Minimum 24 hours
No MaximumTools Required Microcement Trowel
Microcement Mixer
Clean Mixing Bucket
Weighing Scales
Measuring Jug
PPE -
Top Coats
Mixing the Micropool with Comp B
This is pre-mixed with the colour in the tub, so all you need to do is give it a mix before you start to loosen it and make sure the colour is evenly distributed.
Mix the Comp B into the Micropool at a ratio of 10kg Micropool : 500ml Micropool Comp B.
Once mixed, you will have around 45 minutes to work with it, depending on the conditions, so you may want to mix it in smaller batches until you get a feel for it.
You will need 10kg-12kg per 10m2 for 1 coat of Micropool.
Applying the 1st Coat of Micropool
Using a Microcement Trowel, work your way out from one corner creating a random edge pattern. Keep trowel movements small and random, avoid long sweeping arches – as these will show through to your final finish.
Mixing the 3rd Coat of Micropool
Mix in exactly the same way that you mixed the previous coats, here’s a reminder of the process:
Give the tub a good mix before you start to loosen it and make sure the colour is evenly distributed.
Mix the Comp B into the Micropool at a ratio of 10kg Micropool : 500ml Micropool Comp B.
Once mixed, you will have around 45 minutes to work with it, depending on the conditions, so you may want to mix it in smaller batches until you get a feel for it.
You will need 10kg-12kg per 10m2 for 1 coat of Micropool.
Apply the Micropool
Again, these coat needs to be applied thinly. Use exactly the same technique as you did with the previous coats of Micropool.
Leave to Dry
Once you have applied all 3 coats. You can leave it to dry out fully, this should take around 24 hours, but does vary depending on heating, ventilation & the specific site conditions.
Sand with 40/80 Grit Sand Paper
Use a strong sand paper, like Silicone Carbide, to prevent colour from the disc transferring to your work.
Flatten the Micropool with a 40 or 80 grit sandpaper. An orbital sander is ideal. Or for large floor areas, you may prefer to use a floor sander.
Use the sandpaper to remove ridges and drips that have dried in the microcement.
Vacuum the surface to remove all dust and debris. Do not wet the microcement.
We stock a range of Microcement Sanding Discs on our website.
Cemher MicroPool
Process Apply 3 Coats Micropool Mix Ratio 10kg Micropool : 500ml Micropool Comp B Standard Consumption 40kg per 10m2 Estimated Drying Time Between Coats:
Minimum 30 minutes
No Maximum
Before Sealers:
Minimum 24 hours
No MaximumTools Required Microcement Trowel
Microcement Mixer
Clean Mixing Bucket
Weighing Scales
Measuring Jug
PPE -
Sealers
Mixing 1st Coat AquaMax Pro Floors
Mix the AquaMax Pro Comp A with the AquaMax Pro Floors Comp B in a mixing jug and stir gently with a paint stirrer for at least a minute. Do not whisk as it will put too much air in the mix. Leave to rest for a couple of minutes before applying.
For each coat, you will need 500ml AquaMax Pro Comp A + 100ml AquaMax Pro Floors Comp B per 10m2.
The mixing ratio is 5 x AquaMax Pro Comp A : 1 x AquaMax Pro Floors Comp B.
Only mix enough for 1 coat at a time, as the mixture will only last for 45 minutes once combined.
Applying the 1st Coat AquaMax Pro Floors
Use a medium pile roller to apply the AquaMax Pro evenly across the entire area.
Starting in one corner, apply the AquaMax Pro in an area and then go back over it very gently with the roller to remove any excess product, air bubbles and lines.
Work quickly & randomly keeping the edge wet.
Ensure you cover the full area with AquaMax Pro and use the full amount provided (500ml+100ml per 10m2 for each coat).
Leave to Dry
Leave the 1st coat to dry for a minimum of 12 hours before applying the 2nd coat.
Applying the 2nd Coat AquaMax Pro Floors
After 12 hours, you can complete the 2nd coat of AquaMax Pro. Check the surface for bits of dust and debris that may have settled in it. You can use a 400 grit sanding disc or razor scraper to remove these before applying your final coat.
Mix and apply the 2nd coat in exactly the same way that you did the 1st one.
Again, you will need 500ml AquaMax Pro Comp A & 100ml AquaMax Pro Floors Comp B to complete 1 coat over 10m2.
Leave to Dry
Leave for at least 48 hours. Light use only for the first 14 days.
IMPORTANT: Like all cementitious products, microcement takes 28 days to full harden. It’s at it’s softest for the first 14 days after laying. During this time it should only be subjected to light use and light foot traffic.
Any heavy work is not recommended, but if it does take place then we recommend that you cover the floor with a breathable material or only cover down whilst working & lift the protection off for the majority of the time. The surface needs to dry out and harden. If airflow is restricted, it will stain & not cure correctly.
Mixing MaxiPur
Mix the MaxiPur Comp A with the MaxiPur Comp B in a mixing jug and stir gently with a paint stirrer for at least a minute. Do not whisk as it will put too much air in the mix. Leave to rest for a couple of minutes before applying.
For each coat, you will need 400ml MaxiPur Comp A + 200ml MaxiPur Comp B per 10m2.
The mixing ratio is 2 x MaxiPur Comp A : 1 x MaxiPur Comp B.
Only mix enough for 1 coat at a time, as the mixture will only last for 45 minutes once combined.
IMPORTANT: Eye Protection, Gloves, Filtering Masks, suitable for use with Solvents must be worn when working with MaxiPur
Applying the MaxiPur
Use a medium pile roller to apply the MaxiPur evenly across the entire area.
Starting in one corner, apply the MaxiPur in an area and then go back over it very gently with the roller to remove any excess product, air bubbles and lines.
Work quickly & randomly keeping the edge wet.
Ensure you cover the full area with MaxiPur and use the full amount provided.
Swimming Pools & Outdoor Surfaces
Only apply 1 coat of MaxiPur on Swimming Pools and Outdoor Surfaces, this will allow the Microcement to remain semi-permiable and prevent moisture from building up on the underside.
Leave to Dry
Leave the 1st coat to dry for a minimum of 12 hours before applying the 2nd coat.
Leave to Dry
Leave for at least 48 hours. Light use only for the first 14 days.
IMPORTANT: Like all cementitious products, microcement takes 28 days to full harden. It’s at it’s softest for the first 14 days after laying. During this time it should only be subjected to light use and light foot traffic.
Any heavy work is not recommended, but if it does take place then we recommend that you cover the floor with a breathable material or only cover down whilst working & lift the protection off for the majority of the time. The surface needs to dry out and harden. If airflow is restricted, it will stain & not cure correctly.
Cemher AquaMax Pro for Floors
Application on Microne, Microdur Plus & Hydroprimer Application on Polyshield & Micropool Process Application on Microne, Microdur Plus & Hydroprimer: Apply 2 Coats of AquaMax Pro for Floors Application on Polyshield & Micropool: Apply 1 Coat of AquaMax Pro for Floors Mix Ratio Application on Microne, Microdur Plus & Hydroprimer: 5 AquaMax Pro Comp A : 1 AquaMax Pro Comp B
1l AquaMax Pro Comp A : 200ml AquaMax Pro Comp BApplication on Polyshield & Micropool: 5 AquaMax Pro Comp A : 1 AquaMax Pro Comp B
1l AquaMax Pro Comp A : 200ml AquaMax Pro Comp BStandard Consumption Application on Microne, Microdur Plus & Hydroprimer: 1l per 10m2 Application on Polyshield & Micropool: 500ml per 10m2 Estimated Drying Time Application on Microne, Microdur Plus & Hydroprimer: Minimum 12 hours between coats
48 hours before light foot trafficApplication on Polyshield & Micropool: Minimum 12 hours between coats
48 hours before light foot trafficTools Required Application on Microne, Microdur Plus & Hydroprimer: Medium Microfibre Roller
Roller Tray
PPEApplication on Polyshield & Micropool: Medium Microfibre Roller
Roller Tray
PPECemher MaxiPur 50
Internal Surfaces Swimming Pools & External Surfaces Process Internal Surfaces: Apply 2 Coats of MaxiPur 50% Swimming Pools & External Surfaces: Apply 1 Coat of MaxiPur 50% Mix Ratio Internal Surfaces: 2 MaxiPur Comp A : 1 MaxiPur Comp B
1l MaxiPur Comp A : 500ml MaxiPur Comp BSwimming Pools & External Surfaces: 2 MaxiPur Comp A : 1 MaxiPur Comp B
1l MaxiPur Comp A : 500ml MaxiPur Comp BStandard Consumption Internal Surfaces: 1l per 8 - 10m2 Swimming Pools & External Surfaces: 1l per 8 - 10m2 Estimated Drying Time Internal Surfaces: Minimum 12 hours between coats
48 hours before light foot trafficSwimming Pools & External Surfaces: 48 hours before light foot traffic Tools Required Internal Surfaces: Roller Suitable for Use with Solvents
Roller Tray
Protective goggles
Rubber gloves
Filtered mask for organic solventsSwimming Pools & External Surfaces: Roller Suitable for Use with Solvents
Roller Tray
Protective goggles
Rubber gloves
Filtered mask for organic solvents -
After Care
Light Use After 48 Hours
You can start to use the microcement surface 48 hours after the final sealer has been applied. By this time, the microcement is sufficiently waterproof, so you can use showers & taps.
You can also install fittings, but its important that you follow the guidance outlined below, for the first 14 days.
First 14 Days
Like all cementitious products, microcement takes 28 days to full harden. Which means it’s at it’s softest for the first 14 days after laying. It also needs to be kep well ventilated so that air can freely flow from the microcement into the atmosphere as it cures.
During this time it should only be subjected to light use and light foot traffic. And no part of the microcement should be covered over. So no leaving bottles in shower areas or rugs on floors.
Heavy work is not recommended during this time, but if it does take place then we recommend covering the floor with a breathable material and only covering down whilst work is taking place. Protection should lifted off for the majority of the time and certainly through the night. The surface needs to dry out and harden. If airflow is restricted, it could stain permanently & not cure to full strength.
Fixing to Microcement Surfaces
Microcement can be drilled and screwed into using bits that are suitable for the substrate. Any holes or cuts will need protecting from moisture penetration by either putting silicone into screw holes or by surrounding fixtures & fitting entirely with silicone. Use 100% pure silicone for this job, to ensure good adherance to the sealed microcement.
Care must also be taken not to scratch the sealers whilst installing fixtures & fittings.
No Dragging or Dropping
Dragging heavy objects over the surface, or dropping them onto the surface is not recommended at any time, as damage could occur. Lift furniture rather than dragging it, and use lids or felt pads to protect flooring from pressure points or abbrasive surfaces.
Microcement is strong, but due to its limited thickness, it will deform in the event of a strong blow if the support beneath deforms. Generally, abrasion and impact resistance is comparable with hard wood.
Stain Resistance
Chemical resistance depends on the sealer used to protect the product. Our sealers are among the best in the industry for both hardness & strength.
Products containing dyes & acidic or alkaline products like tumeric, vinegar, lemon juice or bleach, may leave slight marks on microcement if left on the surface for prolonged time. If cleaning is done quickly, they shouldn’t stain.
If water stains appear at any time, let the stain dry out & reseal immediately. Stains may become permanent if not treated quickly.
Prolongued Exposure to Water
If water is trapped against the surface for a prolonged length of time it may stain & potentially cause the microcement to blister. It is not advisable to leave wet towels, plant pots, wet shampoo bottles etc. in direct, prolongued contact with the microcement.
Cleaning
Microcement surfaces can be cleaned with any pH neutral cleaning products.
Do not clean microcement surfaces with aggressive or descaling products, such as those which contain chlorine, bleach and ammonia as they can damage the sealers.
Aftercare
Use Cemher Floor Protect every 2 -3 months to protect you microcement and to help build up the sealers. This specially designed product is formulated to maintain and protect microcement surfaces by waterproofing, reviving, and safeguarding previously sealed areas. It effectively restores minor scratches in floors without the use of wax, ensuring that the surface remains scratch-free when walked on.
To use, simply dilute 100ml of the product in 7 liters of water and apply it with a mop or cloth. For optimal results, repeat the application every 2 to 3 months.
Fail to Prepare, Prepare to Fail
Surface prep is the most important part of any job. And because microcement is only 3-4mm finished, it’s more important than ever. But don’t worry, we’ve got you covered. Check out our Surface Prep for detailed guidance on preparing a wide range of surfaces for the microcement application.
Surface Prep
Need Help with your Kit?
Installation issues can happen, but we’re here to help. Our comprehensive troubleshooting guides cover common challenges and proven solutions for microcement application.
View Troubleshooting Guides